Holiday Inn Munich – Unterhaching

Holiday Inn Munich – Unterhaching – Implementation of a New Show Kitchen with Bar

Location · Sector
Unterhaching / Munich · Hospitality


Project Overview

Project Type:
Refurbishment within existing property · Show kitchen · Bar

Scope of Services:
Technical consulting · Technical detail coordination · Supplier selection · Delivery · Installation · Project management during implementation


Initial Situation

As part of a refurbishment within the existing building of the Holiday Inn Munich – Unterhaching, a new show kitchen including a bar was to be realized. The aesthetic and conceptual design of the show kitchen had already been prepared and formed the basis for our work.

Our task was to support the existing design from a technical perspective and translate it into a feasible, buildable solution. To achieve this, we reviewed the specified components, selected technically suitable manufacturers and suppliers, and made necessary detailed adjustments in close coordination with all project stakeholders.


Project Goals

  • Technical realization of the pre-existing show kitchen design
  • Selection of suitable manufacturers and suppliers for the specified components
  • Technical detail coordination and optimization of individual execution details
  • Delivery and installation of the technical equipment
  • Coordination of the involved trades in the show kitchen area
  • Ensuring a synchronized timeline during the renovation phase

Our Solution

Based on the existing design plans, we took over technical consulting and detailed engineering for the new show kitchen with bar. In doing so, we selected the appropriate technical components as well as the corresponding manufacturers and suppliers suited to the concept.

In the course of technical coordination, individual details of the existing plans were refined and adapted to the actual requirements of physical installation.

Subsequently, we handled the delivery and installation of the technical show kitchen equipment overseen by us.

A core component of our service was also project management for the show kitchen conversion. During the execution phase, we coordinated the participating trades regarding their tasks and work schedules. This allowed the individual tasks to be closely aligned and the implementation to be carried out in a structured manner.


Result & Added Value

  • Realization of a new show kitchen with integrated bar area
  • Technically coordinated implementation of the pre-existing design
  • Selection of suitable components, manufacturers, and suppliers
  • Delivery and installation of technical equipment
  • Coordinated collaboration among participating trades
  • Guidance throughout implementation provided by our project management

Project Status

Project Status: Completed


Your Project in Capable Hands

Request a No-Obligation Consultation!