Project Overview

Project Type:
New hotel construction · Commercial kitchen planning · Bar planning

Scope of Services:
Complete kitchen planning · Dishwashing area planning · Preparation zones · Refrigeration and storage planning · Bar planning · Technical development · Delivery · Installation by partner company

Execution:
October 2022


Initial Situation

For the new construction of the hotel the niu Amity in Potsdam, we were commissioned with the complete planning and equipping of all foodservice functional zones. The scope of services encompassed the commercial hotel kitchen including the required preparation, dishwashing, refrigeration, and storage areas, as well as the planning of the bar.

The objective was to develop a kitchen infrastructure tailored to hotel operations, in which the individual work areas are functionally interconnected. In addition to technical planning, the project scope also included the delivery and installation of the specified equipment.


Project Goals

  • Complete planning of the commercial hotel kitchen
  • Functional arrangement of cooking and preparation areas
  • Integration of high-performance thermal kitchen technology
  • Planning of the required dishwashing zones
  • Allocation of refrigeration and storage spaces
  • Planning the technical equipment for the bar area
  • Delivery and installation of the commercial foodservice facilities

Our Solution

We developed a complete design for the foodservice areas of the new hotel build. At the core was the commercial hotel kitchen with its associated work, preparation, dishwashing, and storage zones.

For the cooking area, we planned extensive thermal equipment. This included, among other features, two stacked combi steamers and a modular cooking suite. The appliances were complemented by tailored stainless steel work surfaces, base units, and storage shelving.

In designing the preparation areas, we placed great emphasis on a functional layout of worktops and the required kitchen equipment. Stainless steel furniture, countertops, and additional fixtures were dimensioned according to the spatial conditions of the new building.

Another integral part of our planning was the required refrigeration and storage facilities. These included commercial refrigerators and refrigerated counter base units integrated directly into the kitchen zones.

In addition to kitchen planning, we took on the planning of the bar area with its required technical equipment, ensuring the functional requirements of bar operations were fully accommodated within the overarching design.

Beyond comprehensive planning, we handled the delivery of all foodservice equipment. Installation was executed by one of our partner companies. Thus, the project was guided from technical conception through to the physical implementation of the planned facilities.


Result & Added Value

  • Holistic planning and equipping of the foodservice areas of a new hotel building
  • Functional hotel kitchen equipped with comprehensive thermal technology
  • Coordinated cooking, preparation, and dishwashing areas
  • Integration of the required refrigeration and storage technology
  • Technical planning of the bar area
  • Planning and delivery with subsequent installation by a partner company

Project Status

Project Status: Completed

Completion: October 2022